EGE SOCKS

From Tech Pack to First Bulk Run: What a Sock Factory Needs

A custom sock manufacturer needs seven things to quote accurately: article type and needle count, yarn composition in percentages, construction details, size grading, colour references in Pantone TCX, quantity per design and per colour, and packing specification with destination. Missing quantity per colour and missing packing are the two omissions that make a quote unusable, and they are the two most commonly left out.

Key takeaways

  • A tech pack is not a mood board. It is a set of numbers a machine operator can act on.
  • Quantity has to be split by design and colour, because minimums apply at that level.
  • Send a physical reference sock if you have one. It communicates faster than any document.
  • Two sample rounds is normal. More than that usually means the original brief was incomplete.
  • The signed approval sample, not the tech pack, becomes the reference for the bulk run.

What goes in the tech pack

FieldExampleWhat breaks without it
Article and heightCrew, 200NWrong machine programme
YarnCombed cotton 30/1Hand feel and cost both guessed
Composition80% cotton, 17% polyamide, 3% elastaneNo label, no fit guarantee
ConstructionTerry sole, rib cuff, reinforced heel and toeComfort and wear life unpredictable
BrandingJacquard, 3 colours, artwork attachedLogo resolves badly or not at all
Sizes39/42, 43/46 with ratioCartons packed in the wrong split
ColourPantone TCX referencesShade disputes at approval
QuantityPer design and per colourCannot price the tiers
PackingPolybag, header card, carton countHidden cost appears late

If you have no tech pack, send a reference sock and describe the changes you want against it. That route is often faster and produces fewer misunderstandings than a description written from scratch.

The sequence

Enquiry. Send the specification above with your destination port and target Incoterm. FOB from a Turkish port is the common baseline for EU and US buyers.

Quotation. A usable quote restates the composition, needle count, size grading, packing and Incoterm alongside the price. If those lines are missing, you cannot compare it with anything.

Sampling. At EGE SOCKS this typically takes 5 to 7 days. Expect one revision round on colour or cuff tension.

Approval. Sign the sample, note the yarn lot and colour reference on the tag, and keep it. From here on this is the reference, not the tech pack.

Bulk. Typically 3 to 4 weeks depending on quantity, design complexity and yarn availability. Jacquard, multiple colourways and terry sole constructions sit at the longer end.

Inspection and shipment. Agree in advance whether checks happen in-line, pre-shipment, or both, and who pays. Details of the production sequence are on the sock manufacturing page.

Where projects stall

Three points account for most delays.

The first is artwork. Sending a logo as a screen colour rather than a Pantone TCX reference guarantees a shade discussion at approval. Sending a mark with strokes too fine for the needle count guarantees a second sample round. Both are avoidable in ten minutes at brief stage.

The second is quantity. Brands often give a total and expect a price. Minimums are set per design and colour, so a 6,000 pair order across four designs in three colours is twelve separate minimums. At EGE SOCKS that minimum is typically 1,200 pairs per design; the precise terms for your combination of yarn, construction and packaging come when you request a quotation.

The third is packing. Deciding between a polybag and a printed multipack sleeve after sample approval means new artwork, new assembly time and a revised schedule. It is the cheapest thing to fix early and one of the more expensive to fix late.

Building a range rather than an article

If you are briefing several articles at once, group them by needle count. A range mixing 156N and 200N is entirely possible, but the two run on different machines, so the delivery dates follow the mix rather than a single date. Business socks and sports socks frequently sit on different counts within the same range.

Order slightly deeper on your safest article and thinner on the experimental one. Treat the second order as the real range decision, once you have sell-through rather than opinions.

Technical buyer checklist

  • Write the specification as numbers, not adjectives.
  • Split quantity by design and by colour.
  • Attach artwork with Pantone TCX references, not screen values.
  • Prepare a simplified logo version for the knit.
  • Send a physical reference sock where one exists.
  • Confirm the Incoterm and destination port at enquiry stage.
  • Fix packing format and carton markings before sampling.
  • Agree the number of included sample rounds.
  • Sign and retain the approval sample with the yarn lot noted.
  • Group range articles by needle count when planning dates.

FAQ

What information does a custom sock manufacturer need to quote?

Article type and needle count, yarn composition in percentages, construction details, size grading with ratio, Pantone TCX colour references, quantity per design and per colour, packing specification, destination and Incoterm.

Do I need a tech pack to start?

No, but you need the numbers. A physical reference sock plus a list of changes works well and often communicates faster than a document written from scratch.

How many sample rounds should I expect?

One revision round on colour or cuff tension is normal, so two rounds in total. More than that usually points to an incomplete brief rather than a factory problem.

Why does the quotation depend on quantity per colour?

Because minimums and price tiers apply per design and colour, not to the order total. Each combination means a machine setup and a yarn lot, so a large total split across many combinations produces small runs.

Can EGE SOCKS produce a first custom run for a new brand?

Yes. EGE SOCKS produces on a private label and OEM basis with in-house production in Türkiye. The minimum for private label production is typically 1,200 pairs per design, with final terms depending on yarn, construction and packaging.

How long from approved sample to shipment?

Bulk production typically takes 3 to 4 weeks depending on quantity, design complexity and yarn availability, with freight calculated separately according to the agreed Incoterm.

What happens if we change the packing after approval?

New packaging artwork and assembly setup are required, which resets part of the schedule. Fixing the packing format before sampling avoids this entirely.

Have a project in mind?

Tell us the style, quantity and timeline. You'll get a reply within one business day.

Request a quote
Sourcing Guide